GRANSOALR - GRS has started the mechanical assembly of trackers and modules in Camargo Project (Mexico)
Written by Administrator
PDF Print E-mail

The mechanical assembly of the tracker structure and modules have started in the Camargo project and are going at a good pace.

The Project includes 115.200 modules totaling 35,46 MWdc. The photovoltaic plant of Camargo, is located to the north of Mexico, in Camargo, Chihuahua, (Mexico). The contract was awarded by “Avant Energía Renovables” and includes the construction of the EPC together with the operation and maintenance.